All news

Fortera lands Ozinga as a customer for Missouri cement plant

October 26, 2026

Fortera is moving ahead with construction of its first commercial-scale plant at Mississippi Lime Co.'s flagship operation in Ste. Genevieve, Missouri, and has named Ozinga Bros. Inc. among its first customers, Concrete Products reported on October 23, 2026. The plant will capture CO2 from the lime production line.

Fortera's ReCarb process yields a reactive binder, sold in its ReAct line, that is nearly 50 percent CO2 by weight. The riverfront site allows shipping by barge or rail. Ozinga can bring the powder up the Mississippi and Illinois rivers to supply its ready mixed concrete operations in Chicago.

"Building alongside the largest lime operation in the Americas lets us turn an existing emissions stream into hundreds of thousands of tons of cement to meet demand that already exists," said Fortera co-founder and CEO Ryan Gilliam. Mississippi Lime CEO Paul Hogan, who is serving as National Lime Association president, said lime producers need practical ways to capture calcination emissions.

Precast producers near the Mississippi and Illinois rivers could eventually see a barge-delivered binder from this site. The report gives no startup date or pricing, and the first named buyer is a ready mix operation, so it is too early to plan plant mixes around it.

Source: Concrete Products, October 23, 2026

Source: concreteproducts.com