Alberta precaster tests electric-kiln clinker
Grand Forks Concrete, a precast producer in Lethbridge, Alberta, is running trials with clinker from a pilot plant operated by CURA Climate of Calgary. The CURA process uses electricity instead of high-temperature combustion to make clinker, and the resulting binder carries a much lower CO2 emissions factor than portland cement.
The pilot is small and the product is not commercially available. What makes it worth watching is that a producer is doing the testing on real mixes, which is where most alternative binders stall. Results on strength gain, stripping times and finish will tell plants more than any lab datasheet.
Source: concreteproducts.com